Publisher's Synopsis
This text presents a survey of the state of the art of deterministic resource-constrained project scheduling with time windows. General temporal constraints and several different types of limited resources are considered.
2nd Edition
Paperback (18 Jul 2012)
Includes delivery to the United States
10+ copies available online - Usually dispatched within 7 days
This text presents a survey of the state of the art of deterministic resource-constrained project scheduling with time windows. General temporal constraints and several different types of limited resources are considered.
ISBN: | 9783642072659 |
Publisher: | Springer Berlin Heidelberg |
Imprint: | Springer |
Pub date: | 18 Jul 2012 |
Edition: | 2nd Edition |
DEWEY: | 658.53 |
DEWEY edition: | 22 |
Language: | English |
Number of pages: | 385 |
Weight: | 558g |
Height: | 235mm |
Width: | 155mm |
Spine width: | 21mm |