Publisher's Synopsis
The objectives of this research were to: (1) gather information on historical epoxy lining installations and document the effectiveness of these previously installed liners in protecting cast iron or steel water mains; (2) develop protocols and procedures and conduct accelerated life-cycle tests on epoxy liners to assess their long-term performance; and (3) assess the longevity of early epoxy liner installations for renewal planning.