Publisher's Synopsis
The Navy began procuring John Lewis (TAO-205) class oilers in FY2016, and a total of six have been procured through FY2020, including two in FY2020. The first six TAO-205s are being procured under a block buy contract that was authorized by Section 127 of the FY2016 National Defense Authorization Act (S. 1356/P.L. 114-92 of November 25, 2015). The Navy's FY2021 budget submission estimates that TAO-205s cost about $530 million each when they are procured at a rate of two per year. The Navy wants to procure a total of 20 TAO-205s. The ships are being built by General Dynamics/National Steel and Shipbuilding Company (GD/NASSCO) of San Diego, CA.