Delivery included to the United States

Material Requirement Planning System

Material Requirement Planning System

Hardback (30 Mar 2010)

Save $19.82

  • RRP $53.78
  • $33.96
Add to basket

Includes delivery to the United States

1 copy available online - Usually dispatched within 72 hours

Publisher's Synopsis

This book seeks to give better solutions to managers managing MRP systems in manufacturing organizations. It introduces the concept of multi-pass heuristics in MRP context and shows that in variety of conditions of the shop floor (such as high and low variations in machine utilisation) these (multi-pass given in this book) can be applied to give better performance on the criterion of total aggregate (or units) lateness with insignificant rise in total costs The author explains a heuristic that modifies the holding cost (of items/assemblies that have higher difference of actual and the theoretical holding costs) and empirically shows that this is better than the heuristic that modified the lead time (of items/assemblies that have higher difference of actual and the theoretical holding costs). The book also talks about a series of heuristics that seek to attain co-ordinated arrival of assemblies at assembly centers with encouraging results.

Book information

ISBN: 9788189766207
Publisher: Vitasta Publishing Pvt.Ltd
Imprint: Vitasta Publishing
Pub date:
Language: English
Number of pages: 340
Weight: -1g
Height: 250mm
Width: 200mm
Spine width: 50mm