Delivery included to the United States

Impact of Snow Removal Operations on Thermoplastic Pavement Markings

Impact of Snow Removal Operations on Thermoplastic Pavement Markings

Paperback (21 Nov 2012)

  • $55.88
Add to basket

Includes delivery to the United States

10+ copies available online - Usually dispatched within 7 days

Publisher's Synopsis

This pilot study explored the effect snow removal operations have on thermoplastic pavement markings. Including snow removal as a separate independent variable is unique because much of the previous research performed on pavement marking degradation mentioned snow removal as a direct cause in a marking degrading more rapidly; however, it is mentioned as an afterthought and a suggestion to be considered in future research. This pilot study looked at 10 thermoplastic markings and all marking data were collected in the field, using a hand-held retroreflectometer. Data collected began 60 days after initial marking application and ended 12 months after initial marking application. Data were analyzed using linear regression. A significant finding was that during the first year, white thermoplastic markings located in the center of the road, and that are exposed to snow removal operations do not reach the apex of their break-in phase. Thus the start of the linear degradation phase does not start until at least one year after initial application.

Book information

ISBN: 9781288331277
Publisher: Creative Media Partners, LLC
Imprint: Biblioscholar
Pub date:
Language: English
Number of pages: 86
Weight: 168g
Height: 246mm
Width: 189mm
Spine width: 5mm