Commissioning Buildings in Hot Humid Climates

Commissioning Buildings in Hot Humid Climates Design & Construction Guidelines

1st edition

Paperback (31 Jan 2000)

Not available for sale

Includes delivery to the United States

Out of stock

This service is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Publisher's Synopsis

Prepared in co-operation with Disney Development Company, this book deals exclusively with aspects of the design, construction or operation of buildings for which even relatively minor errors can have devastating results when the building is located in a hot, humid climate. Disney's consistent adherence to the principles outlined in this manual has dramatically reduced problems in its construction. The information presented combines the experience of CH2M Hill, the largest environmental engineering firm in the US, and Disney, one of the premier facility planning and management firms in the world. Key issues covered include indoor air quality problem factors; hot humid climate considerations; new building failure; and a model for future success. Specifically addressed are schematic design, design development, final design, construction, and post-construction startup and system commissioning. The concepts and approaches presented are those which have proven successful in designing and operating problem-free indoor building environments in hot and humid locations.

Book information

ISBN: 9780824709006
Publisher: CRC Press
Imprint: River Publishers
Pub date:
Edition: 1st edition
Language: English
Number of pages: 100
Weight: 362g
Height: 279mm
Width: 216mm
Spine width: 8mm