Thoroughfare Plan for the Town of Wilkesboro and the Town of North Wilkesboro

Thoroughfare Plan for the Town of Wilkesboro and the Town of North Wilkesboro August, 1993 (Classic Reprint)

Hardback (19 Nov 2017)

Not available for sale

Includes delivery to the United States

Out of stock

This service is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Publisher's Synopsis

Excerpt from Thoroughfare Plan for the Town of Wilkesboro and the Town of North Wilkesboro: August, 1993

Western Connector Construct a two-lane facility from the west terminus of the proposed NC 268 Bypass to NC 268 west of the old airport.

Main Street (wilkesboro) Construct a two-lane facility from Main Street at North Spruce Street to SR 2510 approximately mile east of Wilkesboro Blvd.

Eastern Loop Construct a two-lane facility from NC 115 at SR 2510 to SR 1371.

White Pine Street Extend White Pine Street (two-lane) to SR 1371.

About the Publisher

Forgotten Books publishes hundreds of thousands of rare and classic books. Find more at www.forgottenbooks.com

This book is a reproduction of an important historical work. Forgotten Books uses state-of-the-art technology to digitally reconstruct the work, preserving the original format whilst repairing imperfections present in the aged copy. In rare cases, an imperfection in the original, such as a blemish or missing page, may be replicated in our edition. We do, however, repair the vast majority of imperfections successfully; any imperfections that remain are intentionally left to preserve the state of such historical works.

Book information

ISBN: 9780331444728
Publisher: Fb&c Ltd
Imprint: Forgotten Books
Pub date:
Number of pages: 218
Weight: -1g
Height: 10mm
Width: 7mm
Spine width: 1mm