Road Material Source Plan, Environmental Assessment; Draft, April 1992

Road Material Source Plan, Environmental Assessment; Draft, April 1992 Grand Teton National Park, John D. Rockefeller, Jr., Memorial Parkway, Wyoming (Classic Reprint)

Hardback (12 Dec 2017)

Not available for sale

Includes delivery to the United States

Out of stock

This service is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Publisher's Synopsis

Excerpt from Road Material Source Plan, Environmental Assessment; Draft, April 1992: Grand Teton National Park, John D. Rockefeller, Jr., Memorial Parkway, Wyoming

Alternative 8 would provide the same quantity of material but use off-park sites. This alternative would have significant impacts on the cost of the road projects and the economy of the local communities. There would be no impact to park resources except along Spread Creek where the national forest access road (on parklands) would be widened to accommodate haul trucks. Impacts to visitors would be greater under this alternative due to increased hauling distances. Which would mean haul trucks would be on the roads that visitors use for longer periods of time than in alternative A.

About the Publisher

Forgotten Books publishes hundreds of thousands of rare and classic books. Find more at www.forgottenbooks.com

This book is a reproduction of an important historical work. Forgotten Books uses state-of-the-art technology to digitally reconstruct the work, preserving the original format whilst repairing imperfections present in the aged copy. In rare cases, an imperfection in the original, such as a blemish or missing page, may be replicated in our edition. We do, however, repair the vast majority of imperfections successfully; any imperfections that remain are intentionally left to preserve the state of such historical works.

Book information

ISBN: 9780331328936
Publisher: Fb&c Ltd
Imprint: Forgotten Books
Pub date:
Number of pages: 120
Weight: -1g
Height: 10mm
Width: 7mm
Spine width: 1mm