Planning and Control Using Oracle Primavera P6 Versions 8.1 to 15.2 PPM Professional 2016
Paperback (24 Feb 2016)
Not available for sale
Includes delivery to the United States
Out of stock
Check stock
Book information
ISBN: | 9781925185270 |
Publisher: | Eastwood Harris Pty Ltd |
Imprint: | Eastwood Harris Pty Ltd |
Pub date: | 24 Feb 2016 |
Weight: | 842g |
Height: | 181mm |
Width: | 255mm |
Spine width: | 27mm |